20TH CYCLE WDC LISTING PHASE 1 @ 18.03.2022


20TH CYCLE WDC LISTING PHASE 1 @ 18.03.2022

Water disconnection of the month of March 2022 is ongoing and total of units involved are 295 unit for UUC Phase 1

 

No Lot No  Total 
1 A-0-1 3,186.95
2 A-0-7 221.4
3 A-0-8 372.2
4 A-0-9 301.3
5 A-0-10 3,813.45
6 A-0-15 104.35
7 A-1-5 3,197.10
8 A-1-8 240.85
9 A-1-12 154.65
10 A-1-13 201.1
11 A-1-13A 5,813.85
12 A-1-15 240.25
13 A-2-3 218.65
14 A-2-3A 154.55
15 A-2-7 79.45
16 A-2-12 125.95
17 A-2-13 113.35
18 A-2-15 460.3
19 A-2-16 372.65
20 A-3-3A 2,161.35
21 A-3-9 1,090.45
22 A-3-10 3,149.50
23 A-3-12 482.55
24 A-3-13 445.65
25 A-3-15 6,945.30
26 A-3-16 8,232.35
27 A-4-1 1,100.65
28 A-4-2 143.3
29 A-4-3 208.55
30 A-4-3A 12,682.20
31 A-4-5 2,104.70
32 A-4-11 393.3
33 A-4-13 1,639.60
34 A-4-13A 10,368.20
35 A-4-15 9,582.05
36 B-0-12 818.1
37 B-0-13A 953.15
38 B-1-1 237.9
39 B-1-6 9,591.90
40 B-1-7 1,934.05
41 B-2-1 3,779.40
42 B-2-3 3,890.35
43 B-2-6 255.1
44 B-2-9 1,942.50
45 B-2-11 118.75
46 B-3-2 6,125.45
47 B-3-3 10,676.20
48 B-3-3A 55.6
49 B-3-7 304.4
50 B-3-8 7,634.20
51 B-3-9 10,685.20
52 B-3-13 7,704.65
53 B-3-13A 247.25
54 B-3-16 2,077.15
55 B-4-1 7,428.45
56 B-4-3 11,808.10
57 B-4-5 294.25
58 B-4-8 1,401.75
59 B-4-12 137.2
60 B-4-13 88
61 B-4-16 3,819.80
62 C-0-1 469.75
63 C-0-3A 58.85
64 C-0-7 474.75
65 C-0-9 10,599.85
66 C-0-12 142.2
67 C-0-13A 54.2
68 C-0-15 2,402.05
69 C-0-16 247.55
70 C-1-2 81.5
71 C-1-6 1,362.55
72 C-1-7 1,139.75
73 C-1-9 10,683.55
74 C-1-11 55
75 C-1-13 2,911.05
76 C-1-16 248.55
77 C-2-1 12,540.10
78 C-2-3 1,337.90
79 C-2-11 1,201.65
80 C-2-12 6,804.30
81 C-3-6 12,076.65
82 C-3-8 2,387.05
83 C-3-9 1,140.25
84 C-3-13 2,566.70
85 C-4-1 88
86 C-4-5 10,685.85
87 C-4-9 216.3
88 D-0-5 2,041.40
89 D-0-13A 220.1
90 D-1-3 3,405.25
91 D-1-7 229.85
92 D-1-11 3,932.75
93 D-2-11 113.35
94 D-2-13 10,683.55
95 D-2-16 259.4
96 D-3-1 10,757.35
97 D-3-3 58.55
98 D-3-6 2,693.15
99 D-3-7 7,953.85
100 D-3-9 88
101 D-3-10 1,517.95
102 D-3-11 51.8
103 D-3-12 151
104 D-3-13 10,683.55
105 D-4-1 104.5
106 D-4-2 7,560.60
107 D-4-3A 389.35
108 D-4-5 5,603.50
109 D-4-7 8,795.85
110 D-4-10 3,218.45
111 D-4-13 10,359.35
112 E-0-2 649.55
113 E-0-7 79.65
114 E-0-8 10,003.35
115 E-0-11 10,683.55
116 E-0-13 126.85
117 E-0-15 3,936.35
118 E-0-16 254.25
119 E-1-2 2,289.75
120 E-1-3 113.6
121 E-1-16 138.45
122 E-2-10 612.3
123 E-2-12 695.4
124 E-3-2 12,714.30
125 E-3-3 294.85
126 E-3-10 658.8
127 E-3-13 11,402.40
128 E-4-2 12,756.10
129 E-4-5 9,766.10
130 E-4-7 1,841.85
131 E-4-10 12,731.45
132 E-4-11 10,657.00
133 F-0-3A 130.95
134 F-0-7 210.45
135 F-0-9 3,950.70
136 F-0-12 65.8
137 F-0-13 10,683.55
138 F-0-13A 503.05
139 F-1-8 12,682.55
140 F-1-9 1,038.95
141 F-1-10 1,383.10
142 F-1-11 1,089.75
143 F-2-2 12,716.00
144 F-2-3 7,088.00
145 F-2-3A 241.7
146 F-2-5 9,728.45
147 F-2-6 327.65
148 F-2-7 123.7
149 F-2-9 10,693.50
150 F-2-11 294.75
151 F-2-13A 2,460.45
152 F-2-16 4,093.70
153 F-3-6 53.65
154 F-3-11 9,024.30
155 F-3-12 12,582.80
156 F-3-13A 461.35
157 F-3-15 9,870.00
158 F-4-1 5,547.85
159 F-4-7 487.45
160 F-4-8 6,443.65
161 F-4-9 468.85
162 F-4-10 302.3
163 F-4-11 5,958.60
164 F-4-13 601.55
165 F-4-13A 687.95
166 F-4-16 1,314.75
167 G-0-1 513.95
168 G-0-3 295.85
169 G-0-3A 104.05
170 G-0-7 1,568.65
171 G-0-10 1,350.10
172 G-0-16 137.95
173 G-1-3 10,684.00
174 G-1-11 352.3
175 G-1-15 3,440.00
176 G-2-1 240.1
177 G-2-6 12,682.35
178 G-2-13A 657.45
179 G-2-16 2,764.50
180 G-3-1 145.75
181 G-3-2 162.8
182 G-3-3 4,796.20
183 G-3-8 143.65
184 G-4-2 12,394.35
185 G-4-5 1,585.70
186 G-4-11 10,369.20
187 H-0-3 128.6
188 H-0-3A 136.8
189 H-0-9 8,617.10
190 H-0-13 795.55
191 H-1-3 119.3
192 H-1-9 10,683.55
193 H-2-1 353.5
194 H-2-3A 4,808.15
195 H-2-5 482.55
196 H-2-10 3,165.20
197 H-2-12 989
198 H-3-5 121.7
199 H-3-7 2,657.95
200 H-3-8 7,392.00
201 H-3-15 1,462.54
202 H-4-5 307.15
203 H-4-6 12,682.20
204 H-4-9 10,683.80
205 H-4-13 3,465.15
206 H-4-15 5,159.00
207 I-0-8 6,755.70
208 I-0-9 1,121.65
209 I-0-11 298.85
210 I-1-3 3,831.05
211 I-1-6 11,741.95
212 I-1-9 2,036.75
213 I-2-6 4,098.05
214 I-3-7 10,463.75
215 I-3-8 2,549.25
216 I-3-13A 8,662.40
217 I-3-15 5,503.15
218 I-3-16 768.05
219 I-4-3A 248.75
220 I-4-5 2,335.10
221 I-4-6 160.05
222 I-4-7 105.1
223 I-4-10 6,263.00
224 I-4-11 10,512.55
225 J-0-7 9,358.45
226 J-1-1 267.2
227 J-1-3 8,409.45
228 J-1-3A 92.2
229 J-1-5 9,485.00
230 J-2-3 113.1
231 J-2-7 297.75
232 J-2-11 651.75
233 J-3-5 1,450.50
234 J-3-6 2,791.25
235 J-3-7 4,616.30
236 J-3-9 82.6
237 J-3-10 2,938.90
238 J-3-12 9,033.00
239 J-3-15 268.15
240 J-4-1 169.65
241 J-4-3 180.65
242 J-4-3A 2,945.55
243 J-4-6 12,147.85
244 J-4-7 10,680.30
245 J-4-9 101.35
246 J-4-11 1,784.65
247 J-4-12 12,679.05
248 J-4-15 101.15
249 K-0-3 186.15
250 K-0-13A 12,459.25
251 K-1-7 3,669.80
252 K-1-12 11,609.35
253 K-1-15 240.1
254 K-2-3A 1,902.50
255 K-3-2 11,518.05
256 K-3-3 828.2
257 K-3-5 2,165.60
258 K-3-7 9,061.10
259 K-3-9 299.7
260 K-3-10 143.3
261 K-3-12 1,122.85
262 K-3-13 2,273.35
263 K-4-1 280.95
264 K-4-5 7,334.90
265 K-4-6 1,467.35
266 K-4-7 201.65
267 K-4-10 52.75
268 K-4-11 1,038.65
269 K-4-12 517.9
270 K-4-13 10,696.15
271 K-4-13A 342.6
272 L-0-6 8,218.00
273 L-0-7 201.1
274 L-0-13A 241.7
275 L-1-3 1,559.45
276 L-2-6 1,359.10
277 L-2-7 2,617.05
278 L-2-11 386.65
279 L-3-1 250.25
280 L-3-3A 4,185.95
281 L-3-5 4,238.40
282 L-3-8 350.15
283 L-3-13 398.75
284 L-3-16 12,690.25
285 L-4-2 249.1
286 L-4-3 185.6
287 L-4-5 9,285.30
288 L-4-7 123.1
289 L-4-8 12,712.80
290 L-4-9 9,657.15
291 L-4-11 1,983.25
292 L-4-13 88.45
293 L-4-13A 847.85
294 L-4-15 248.55
295 L-4-16 12,714.30