9TH CYCLE WDC LISTING PHASE 1 @ 24.11.2020 (Part 1)


9TH CYCLE WDC LISTING PHASE 1 @ 24.11.2020 (Part 1)

 Water disconnection of the month of November is ongoing and total of units invloved are 442 unit for UUC Phase 1 

 

NO LOT NUMBER  Total 
1 A-0-1               1,128.85
2 A-0-10               1,679.35
3 A-0-13                   100.20
4 A-0-3               6,746.75
5 A-0-3A                   175.35
6 A-0-7               1,836.90
7 A-0-8               1,450.70
8 A-1-13A               3,537.05
9 A-1-5               1,414.00
10 A-2-13                     89.85
11 A-2-3                   255.75
12 A-3-1                   192.80
13 A-3-10               1,986.45
14 A-3-12               2,766.25
15 A-3-13                     71.00
16 A-3-13A                   530.10
17 A-3-15               4,583.15
18 A-3-16               5,745.80
19 A-3-3                   257.65
20 A-3-3A                   196.55
21 A-4-1               2,818.65
22 A-4-10                   197.10
23 A-4-12               4,076.15
24 A-4-13                   347.35
25 A-4-13A               7,757.30
26 A-4-15               8,838.20
27 A-4-3A               9,923.00
28 A-4-5                   599.35
29 B-0-12                   380.00
30 B-0-13A                   648.25
31 B-0-3                   676.60
32 B-0-7                     71.00
33 B-0-8                     96.95
34 B-1-1                   215.95
35 B-1-2               3,894.35
36 B-1-5                   259.45
37 B-1-6               7,017.15
38 B-1-7                   257.15
39 B-2-1               1,670.70
40 B-2-3A                   219.65
41 B-2-9                   261.90
42 B-3-10                   104.50
43 B-3-13               5,580.90
44 B-3-13A                   204.25
45 B-3-15               1,417.30
46 B-3-16                   100.90
47 B-3-2               3,833.10
48 B-3-3               8,351.15
49 B-3-6                     99.10
50 B-3-8               5,219.60
51 B-3-9               8,359.70
52 B-4-1               5,037.95
53 B-4-13                   358.75
54 B-4-16               1,662.25
55 B-4-3               9,404.60
56 B-4-3A               2,394.75
57 B-4-6               6,669.20
58 B-4-8                   411.85
59 C-0-13A                     86.60
60 C-0-15                   413.50
61 C-0-16                   104.50
62 C-0-3                   254.00
63 C-0-5                   159.00
64 C-0-9               8,282.45
65 C-1-11                   443.65
66 C-1-13               1,146.75
67 C-1-16                   104.50
68 C-1-5                     71.00
69 C-1-6                   982.10
70 C-1-7                   168.60
71 C-1-9               8,358.05
72 C-2-1               9,794.35
73 C-2-12               9,320.15
74 C-2-3               1,600.90
75 C-2-3A                   206.10
76 C-3-13                   832.15
77 C-3-6               9,318.25
78 C-3-7                   159.00
79 C-3-8                   532.75
80 C-3-9               1,197.15
81 C-4-1                     98.25
82 C-4-12                   197.10
83 C-4-5               8,360.20
84 D-0-10                   306.60
85 D-0-5                   354.15
86 D-1-1                   128.80
87 D-1-11               2,091.80
88 D-1-15                   303.50
89 D-1-2               1,248.45
90 D-1-3               1,603.20
91 D-2-11                   854.65
92 D-2-13               8,358.05
93 D-2-16                   769.35
94 D-2-2                   317.15
95 D-2-3A                     88.60
96 D-2-6                   151.45
97 D-3-1               8,125.95
98 D-3-10                   644.20
99 D-3-11                     50.00
100 D-3-13               8,358.05
101 D-3-15               6,748.40
102 D-3-5                   252.25
103 D-3-6               1,535.05
104 D-3-7               5,811.30
105 D-4-10               1,141.90
106 D-4-13               8,054.65
107 D-4-2               5,150.20
108 D-4-3A                   330.75
109 D-4-5               3,626.10
110 D-4-7               6,593.35
111 D-4-9                     76.15
112 E-0-11               8,358.05
113 E-0-12                   200.20
114 E-0-15               1,818.35
115 E-0-2                     96.00
116 E-0-8               7,422.70
117 E-1-2               1,001.95
118 E-1-9                     60.15
119 E-2-11               1,244.55
120 E-2-12                   137.10
121 E-2-16                     97.15
122 E-2-3               7,293.10
123 E-2-5                     64.20
124 E-3-1               1,379.65
125 E-3-13               9,022.95
126 E-3-13A                   233.20
127 E-3-2               9,949.60
128 E-4-10               9,972.15
129 E-4-11               8,332.80
130 E-4-2               9,988.25
131 E-4-3                     71.00
132 E-4-5               8,358.20
133 E-4-7                   164.45
134 F-0-10               2,712.20
135 F-0-13               8,358.05
136 F-0-13A                   527.25
137 F-0-2                   828.60
138 F-0-3A                     53.95
139 F-0-9               2,105.95
140 F-1-1               1,085.55
141 F-1-11               1,932.65
142 F-1-8               9,923.35
143 F-2-13A               1,244.75
144 F-2-15                     88.25
145 F-2-16               1,946.05
146 F-2-2               9,951.30
147 F-2-3               5,010.50
148 F-2-5               8,360.50
149 F-2-9               8,367.20
150 F-3-11               6,806.30
151 F-3-12               9,833.40
152 F-3-13A                   581.50
153 F-3-15               7,304.10
154 F-3-9                     88.00
155 F-4-1               3,296.80
156 F-4-11               3,965.80
157 F-4-13                   392.60
158 F-4-3A                   202.10
159 F-4-8               4,113.35
160 F-4-9               7,596.85
161 G-0-1               3,812.40
162 G-0-11               1,056.30
163 G-0-3A                   216.70
164 G-1-15               1,353.80
165 G-1-3               8,358.50
166 G-1-3A                     92.60
167 G-1-7                   697.65
168 G-2-1                   530.00
169 G-2-13A                   306.60
170 G-2-16                   724.80
171 G-2-2                   138.05
172 G-2-6               9,923.15
173 G-2-7                     71.45
174 G-3-1                   991.80
175 G-3-15               9,080.15
176 G-3-3               2,882.05
177 G-3-5                   352.40
178 G-3-8                   308.05
179 G-4-11               8,065.05
180 G-4-13               1,312.95
181 G-4-2               9,650.75
182 G-4-7               8,058.30
183 G-4-9                   682.35
184 H-0-9               6,431.10
185 H-1-2                   907.20
186 H-1-5                   829.55
187 H-1-9               8,358.05
188 H-2-10               1,094.20
189 H-2-3A               2,609.15
190 H-3-15               1,951.34
191 H-3-5               1,313.70
192 H-3-7                   912.25
193 H-3-8               4,981.75
194 H-4-1                     65.50
195 H-4-13               5,392.60
196 H-4-15               2,938.60
197 H-4-5               8,404.45
198 H-4-6               9,923.00
199 H-4-9               8,358.30
200 I-0-16                   202.40
201 I-0-5               2,793.45
202 I-0-6                   152.10
203 I-0-8               4,410.15
204 I-1-1               1,237.15
205 I-1-3               1,991.80
206 I-1-3A                   105.04
207 I-1-5                   161.45
208 I-1-6               9,065.10
209 I-1-9               1,470.55
210 I-2-1               2,622.20
211 I-2-3A                   121.45
212 I-2-6               1,935.70
213 I-2-7                   896.80
214 I-3-1                     57.20
215 I-3-13A               6,179.45
216 I-3-15               3,229.80
217 I-3-16                   870.65
218 I-3-3                   877.85
219 I-3-7               8,153.05
220 I-3-8                   535.30
221 I-3-9                     76.40
222 I-4-10               3,938.20
223 I-4-11               8,198.20
224 I-4-3A                     97.40
225 I-4-5                   628.75
226 I-4-6                   494.00
227 J-0-11                   500.25
228 J-0-6                   321.10
229 J-0-7               7,116.85
230 J-1-1                   206.40
231 J-1-13                   260.85
232 J-1-13A                     90.65
233 J-1-15                     52.10
234 J-1-3               6,233.10
235 J-1-3A                     69.75
236 J-1-5               7,227.75
237 J-1-8                     97.80
238 J-2-11                     88.00
239 J-2-13A                   492.95
240 J-2-15               1,169.50
241 J-2-16                   760.85
242 J-2-7                   184.95
243 J-2-8                   101.65
244 J-3-10                   785.50
245 J-3-12               6,514.75
246 J-3-13                     82.75
247 J-3-5               1,946.15
248 J-3-6               1,032.50
249 J-3-7               2,718.20
250 J-3-9                   253.40